DBT85
Established Member
Not sure if you csn see it in my build, but I did the walls first and then the ceiling. I just put a length of batten on the gable osb for the ceiling osb to secure to.Thanks, my reading of this is that the studs are stepped at the top tp sit under the rafter, and the "extra rafter" pieces are 47 by 47mm. I guess the celing OSB has to be fitted before the gable inner OSB?
And yes, the studs are notched to sit under the rafter and protrude up the face of it and then some 50*50 to infil.