I have a wall between my drive and garden which is in need of attention.
The side I see from the house is fine, I guess it must have been repointed at some time
The side that looks on to the veg garden is in a really bad state
It's strange because the wall goes right round the property and the rest is not too bad, just the veg garden side that has deteriorated, guess maybe it catches the weather or something.
Any ideas what I can do, I know it will never look pretty? Do I just point it the best I can to give it some strength? Am expecting to be told I need to use lime mortar, would rather not if I can use something else? I fear whatever is done with pointing it will just end up looking like it's rendered but if I try to replace the bad bricks I might as well have built a new wall. Have had a couple of passing builders look at it but they were not really interested. The wall still feels strong and stable, has a slight lean in places but has done as long as I can remember.
The side that needs pointing is about 35 m long so I don't want to be doing it twice!
Any advice?
Thanks, Doug
The side I see from the house is fine, I guess it must have been repointed at some time
The side that looks on to the veg garden is in a really bad state
It's strange because the wall goes right round the property and the rest is not too bad, just the veg garden side that has deteriorated, guess maybe it catches the weather or something.
Any ideas what I can do, I know it will never look pretty? Do I just point it the best I can to give it some strength? Am expecting to be told I need to use lime mortar, would rather not if I can use something else? I fear whatever is done with pointing it will just end up looking like it's rendered but if I try to replace the bad bricks I might as well have built a new wall. Have had a couple of passing builders look at it but they were not really interested. The wall still feels strong and stable, has a slight lean in places but has done as long as I can remember.
The side that needs pointing is about 35 m long so I don't want to be doing it twice!
Any advice?
Thanks, Doug