Reply to thread

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

From new, solid ground floor dwellings were/are mostly fed via steel comduit embedded in the concrete. But there are always exceptions. I've done a fair bit of that in my time. The biggest problem was the concrete pourers who run the risk of knocking the pipework and rnd boxes out of position.


Back
Top