paul_allen
Member
New to the forum, happy to be here.
I built a sled about 6 months ago and go it to 0.5mm accuracy over 2000mm using the 5 cut method. This morning I noticed it is out by 2mm over the same distance. Is this common?!?
Sled and fence are made of MDF and screwed together, rails are glued. I am very careful when moving and storing it, so I don't think it has been knocked or damaged. Only other thing could be the saw, but I check that regularly and I'm told the saw is pretty robust and doesn't shift around, it's the AT254LTS.
Any insight would be greatly appreciated!
I built a sled about 6 months ago and go it to 0.5mm accuracy over 2000mm using the 5 cut method. This morning I noticed it is out by 2mm over the same distance. Is this common?!?
Sled and fence are made of MDF and screwed together, rails are glued. I am very careful when moving and storing it, so I don't think it has been knocked or damaged. Only other thing could be the saw, but I check that regularly and I'm told the saw is pretty robust and doesn't shift around, it's the AT254LTS.
Any insight would be greatly appreciated!