I've been making some 2100 x 560 shaker doors with the loose tenon method and I'm gluing with PVA.
Only have enough clamps for one door at a time but I'm on a bit of time pressure, how long would you reckon I could get away with clamping them without risking the joins? They're being clamped indoors if that matters.
Thanks!
Only have enough clamps for one door at a time but I'm on a bit of time pressure, how long would you reckon I could get away with clamping them without risking the joins? They're being clamped indoors if that matters.
Thanks!