artie
Sawdust manufacturer.
My 36 inch ride on is waiting for an oil seal, so I have to use a 15 inch Mountfield push mower to do it all.
Bit tedious .
The biggest bit at the rear is around 1500 sq mtrs and takes a bit over 90 mins to cut.
But I think it is cut closer and looks better than it did with the ride on. So I did some calculations.
A 22" should do it in around 60 mins.
A 30" should do it around 45 mins and I know the 36" does it around 40 mins.
I'm actually considering buying a 22" and selling the ride on when fixed.
The purchase cost to time ratio seems to favour a 22" as the price jump to a 30" seems to outweigh the 15 minute per week time saving.
Any thoughts welcome.
Bit tedious .
The biggest bit at the rear is around 1500 sq mtrs and takes a bit over 90 mins to cut.
But I think it is cut closer and looks better than it did with the ride on. So I did some calculations.
A 22" should do it in around 60 mins.
A 30" should do it around 45 mins and I know the 36" does it around 40 mins.
I'm actually considering buying a 22" and selling the ride on when fixed.
The purchase cost to time ratio seems to favour a 22" as the price jump to a 30" seems to outweigh the 15 minute per week time saving.
Any thoughts welcome.