I's M6 thread and the thread is 25mm long , Axminster say " Around 20 weeks "
Prefer a UK supplier not china or Hong Kong
Thanks
Prefer a UK supplier not china or Hong Kong
Thanks
I's M6 thread and the thread is 25mm long , Axminster say " Around 20 weeks "
Prefer a UK supplier not china or Hong Kong
ThanksView attachment 90873
Link doesn't work.Try WDS of Leeds
eBay!
Even if you bought one from a shop here, you still bought from China at that price
Aidan
And your point is ?
That despite your preference you probably have purchased from the far east, so your prefference may not be material to you thought process, so maybe next time you can get what you want more easily by not trying to avoid something you have not actually avoided
Aidan
I thought his point was more about delivery than manufacture?
Enter your email address to join: