I have decided to do a 22mm chipboard subfloor and then get a heavy duty lino to go on top. Below the chipboard will be some extra dpm then 50mm celotex with a vapour barrier before the chipboard.
My question is this. Do I have to put down say 50mm joists to secure the chipboard flooring too or will it sit firm and still by just gluing all the joins together making one big sheet. Or is there some sort of adhesive I could use mayby to stick it to the celotex? There are no joists at the moment as I have just sat the frame on a course of bricks and a 100mm concrete pad.
Im just parnoid that when the lino is stuck down I will feel movement from the subfloor when walking on it if its not secured down.
Any advice would be greatly appreciated. Thanks
My question is this. Do I have to put down say 50mm joists to secure the chipboard flooring too or will it sit firm and still by just gluing all the joins together making one big sheet. Or is there some sort of adhesive I could use mayby to stick it to the celotex? There are no joists at the moment as I have just sat the frame on a course of bricks and a 100mm concrete pad.
Im just parnoid that when the lino is stuck down I will feel movement from the subfloor when walking on it if its not secured down.
Any advice would be greatly appreciated. Thanks