Some might remember I had a thread about some wall panelling I was doing where the ceiling was 5" out of level (nearly finished it, will update soon) well of course I get the job of fitting some wardrobes in the bedroom above, I do get all the good jobs
I didn't make the wardrobes I was just asked to fit them. I was told they would turn up fully assembled and painted which they didn't, just a big pile of bits with a few parts missing, some of the carcasses didn't even fit together properly without a good bit of trimming. When we enquired about the missing parts we were told they got missed because they were still in the paint shop, they got sent but not painted which accounts for the 50 shades of grey. The polythene is still on the doors as I thought they might be going back, you might be able to tell from the photos that even the doors that turned up at the same time are different colours
I do enjoy a challenge and it was actually good fun to fit despite the supply problems. The wardrobe on the right is actually about an inch lower than the one on the left to try and make things look something like right. The supplier is sending over a painter for a couple of days to sort out the paintwork.
I start fitting out the dressing room this week
I didn't make the wardrobes I was just asked to fit them. I was told they would turn up fully assembled and painted which they didn't, just a big pile of bits with a few parts missing, some of the carcasses didn't even fit together properly without a good bit of trimming. When we enquired about the missing parts we were told they got missed because they were still in the paint shop, they got sent but not painted which accounts for the 50 shades of grey. The polythene is still on the doors as I thought they might be going back, you might be able to tell from the photos that even the doors that turned up at the same time are different colours
I do enjoy a challenge and it was actually good fun to fit despite the supply problems. The wardrobe on the right is actually about an inch lower than the one on the left to try and make things look something like right. The supplier is sending over a painter for a couple of days to sort out the paintwork.
I start fitting out the dressing room this week