mindthatwhatouch
Established Member
Hi,
On the long list of jobs is sorting the gap in my double doors.
Made by me, been up for just over four years, treated softwood and external ply, each door 1300mm wide.
The gap between the doors has increased to about 9mm which is causing catch and lock to only just engage, also it’s a bit rattle and drafts, so it needs sorting.
If I pack the hinges to take it up then the hinge will be right on the edge of the rebate, and being forced into using plastic packers as the stainless ones I can only seem to source in packs of 50.
So should I
1) pack the hinges, 1mm on each hinge will halve the gap, but of course increases the gap on the hinge side.
2) Cut off edge on one door, fix some lipping and recut the hinges ( or do this on the catch side of the secondary door)
Or 3) fix an aluminium plate to the catch side of the secondary door (say 5mm) and
refit the latch plates.
If 2 or 3 how much gap do I leave? Gap didn’t seem to close up much during the last winter, I don’t mind the extra work involved in these solutions but don’t want to have to be continually faffing with it.
Thanks in advance.
On the long list of jobs is sorting the gap in my double doors.
Made by me, been up for just over four years, treated softwood and external ply, each door 1300mm wide.
The gap between the doors has increased to about 9mm which is causing catch and lock to only just engage, also it’s a bit rattle and drafts, so it needs sorting.
If I pack the hinges to take it up then the hinge will be right on the edge of the rebate, and being forced into using plastic packers as the stainless ones I can only seem to source in packs of 50.
So should I
1) pack the hinges, 1mm on each hinge will halve the gap, but of course increases the gap on the hinge side.
2) Cut off edge on one door, fix some lipping and recut the hinges ( or do this on the catch side of the secondary door)
Or 3) fix an aluminium plate to the catch side of the secondary door (say 5mm) and
refit the latch plates.
If 2 or 3 how much gap do I leave? Gap didn’t seem to close up much during the last winter, I don’t mind the extra work involved in these solutions but don’t want to have to be continually faffing with it.
Thanks in advance.