Time for an update to this saga ;-)
The plaster around the first fix socket back boxes was in a pretty poor state so I needed to make good around them, I found a double and single box "Electrical Backbox Plastering Guide" kit on ebay that I thought worth a try, it works really well leaving a nice clean shape to fix to.
After time to let the plaster dry some it was wiped down with a damp cloth and on with white matt emulsion thinned 40% with water, 2 coats, 2nd with less water and then a final proper coat on all but one wall and ceiling having filled where needed most.
Wife chose a colour for the feature wall, crown english fire matt emulsion. Suprisingly had I been more careful it would have covered in one coat, but as I had not been a second coat was needed.
Now its electrics 2nd fix time and I have done all the wall sockets, isolation switches, fcu's & cooker outlet. The spot rails are up and I just need to fit the replacement 6ft fitting in place of the hanging tube in the pics and its then ready for final circuit tests and connecting at the consumer unit.
The kitchen units all turned up yesterday (homebase) seems from the packaging that they may come from Germany.
I still have to plumb in hot and cold water right round the walls from the old kitchen and have to get a gas supply for the hob in place.
Plus I need to alter the still in place temp waste pipework feeding the old kitchen sink and wash machine or delay fitting the last unit until the new sink etc is in place and working.
Not looking good for "ready for Xmas" but it shouldnt now be too long after before its at least usable.