seems like every project I build needs to use more clamps than the last one... despite having a fair collection of cheap sash clamps I can't remember the last time there were any left hanging by the time the last one was in place...
5 ally sash clamps for the cost of 1 Bessy... that mess gets nuts in a hurry when yer lookin at 20+ clamps in use in one operation...
if I'm doing panels, I get by with between 2 and 5 depending on the size; provided it's a fairly 2 dimentional glue up, I give it a half hour on the bench (more to suit my need to de-stress than for the job) then it's off the bench to stand upright someplace outa the way and onto the next one...
Looking at the size of their heads, I'd guess that maybe 6 of em would take up the same rack space as my 24 x 3ft'ers...
I've managed without em all this time... can't see that changing this side of a lottery win...
5 ally sash clamps for the cost of 1 Bessy... that mess gets nuts in a hurry when yer lookin at 20+ clamps in use in one operation...
if I'm doing panels, I get by with between 2 and 5 depending on the size; provided it's a fairly 2 dimentional glue up, I give it a half hour on the bench (more to suit my need to de-stress than for the job) then it's off the bench to stand upright someplace outa the way and onto the next one...
Looking at the size of their heads, I'd guess that maybe 6 of em would take up the same rack space as my 24 x 3ft'ers...
I've managed without em all this time... can't see that changing this side of a lottery win...