doctor Bob
Established Member
- Joined
- 22 Jun 2011
- Messages
- 5,171
- Reaction score
- 1,881
So at last we have finished this kitchen. Due to lockdowns, client having new build issues, supply problems the kitchen has taken 11 months!!! Finished today. The island is solid pippy oak cut from one slab each side to keep the grain flowing. 30 mm splines in drawer corners. Pippy oak end panels. 2mm stainless steel worktop on a pippy oak sub base, with a flush stainless steel hob. Sat on a black plinth.
The carcasses are quarter sawn oak veneers with Matt black doors farrow and ball pitch black. All push to open.
Corian worktop with moulded sink.
Done about 12 other kitchens whist this one has been ongoing.
The carcasses are quarter sawn oak veneers with Matt black doors farrow and ball pitch black. All push to open.
Corian worktop with moulded sink.
Done about 12 other kitchens whist this one has been ongoing.
Attachments
Last edited: