DomP, When I built my workshop (look for 4.4 x 6.8mt Workshop in a grade 2 listed property - I will update) I used scaffold boards as the shuttering for the sand, Type 1 and the concrete. I folded the DPM up the scaffold board and turned it back into itself about halfway up the concrete height...