To tell you the truth I’m not really sure how the membranes work ect, this was how the architect and building control specified it so I just went along with it. The full build up is 6x2 with rock wool between studs, 11mm osb, breathable membrane, 50mm celotex, 25mm batten with cedar cladding on top.