Mark A
Established Member
Hi chaps,
I'm going to lay 14m3 of laminate next week for my sister so I need to get everything in order beforehand. The 22mm T&G chipboard subfloor looks relatively new, but it's nowhere near flat or level - over 8m it drops almost 3 inches, and undulates in all directions. Ideally the chipboard should be taken up and the joists packed out (or entirely replaced; the ceiling below needs reskimming anyway) however I live near Swansea and she's outside Coventry, so I want to get it over and done with in one go.
Any suggestions ow I can go about it? Shim the largest dips with hardboard or thin ply and cover with rigid underlay?
Cheers,
Mark
I'm going to lay 14m3 of laminate next week for my sister so I need to get everything in order beforehand. The 22mm T&G chipboard subfloor looks relatively new, but it's nowhere near flat or level - over 8m it drops almost 3 inches, and undulates in all directions. Ideally the chipboard should be taken up and the joists packed out (or entirely replaced; the ceiling below needs reskimming anyway) however I live near Swansea and she's outside Coventry, so I want to get it over and done with in one go.
Any suggestions ow I can go about it? Shim the largest dips with hardboard or thin ply and cover with rigid underlay?
Cheers,
Mark